Home Legend HL13 Installation Guide Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 11
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
Doc. ID: 122 Rev: 2 Effective: 2/24/2014 Page | 7
Glue Down Installation
PLEASE NOTE:
ANY EXCESS GLUE WHICH GETS ONTO THE SURFACE OF THE FLOOR MUST BE REMOVED IMMEDIATELY WITH ADHESIVE REMOVER
The steps in glue down method are very similar to the floating installation method. The only difference is the application of the glue to the
subfloor prior to installation. For more detail instruction, see the floating installation section above.
Step 1 Set up
Cut off the tongue from the long edge of the boards for the first rows.
Ensure expansion gap by marking off a starting line 1/2” away from the starting wall. Use board or spacers if available during
installation.
Step 2 Spreading the glue
Spread the glue from the starting line out in the direction of the center of the room, the width of two planks. Or spread only enough
glue to install what can be set within 45 minutes (15 minutes of OPEN TIME and an additional 30 minutes for actual installation.
Usually about two rows width coverage). Different manufacturer may require different open time and set time.
Repeat with the next two rows, etc.
Step 3 Install the first two rows
Install the first row of starter planks.
The last plank of the first row may have to be cut to size. Discard remainder because the tongue has been removed.
Install the second row. Make sure there is a random staggering at the end joints of at least 6” apart.
Be attentive to staggering the ends of the boards correctly in adjacent rows to avoid clustering end joints.
Any glue spots which accidently got onto the face of the boards be removed immediately using adhesive cleaner for the glue being
used. Follow adhesive manufacturer’s instruction on how to do it.
Page view 6
1 2 3 4 5 6 7 8 9 10 11

Comments to this Manuals

No comments